Skip to content
  • Home
  • About Us
    • SSCAFCA Staff
    • Our Building
    • Careers
  • News
    • Arroyo de la Barranca Lateral Erosion Envelope (LEE) Property Acquisition Project
    • AHRA
    • Bond Election
    • Board Meetings
    • Board Meeting Agendas Archive
    • Board Meeting Minutes Archive
    • RFP’s/IFB’s
  • Projects
  • Education & Outreach
    • Stormwater Quality Program
    • Know Your Arroyos
    • Outreach Programs
    • Research
    • Real Time Rainfall
    • Interactive Map
    • Annual Reports
  • Fiscal Services
  • Resources
    • SSCAFCA Criteria Manuals
    • Policy/Development
    • Watershed Park Management Plans
    • Sediment and Erosion Design Guide
    • Quality of Life
    • Standard Drawings & Specifications
  • Contact Us
Mobile Logo
Desktop Logo
  • Home
  • About Us
    • SSCAFCA Staff
    • Our Building
    • Careers
  • News
    • Arroyo de la Barranca Lateral Erosion Envelope (LEE) Property Acquisition Project
    • AHRA
    • Bond Election
    • Board Meetings
    • Board Meeting Agendas Archive
    • Board Meeting Minutes Archive
    • RFP’s/IFB’s
  • Projects
  • Education & Outreach
    • Stormwater Quality Program
    • Know Your Arroyos
    • Outreach Programs
    • Research
    • Real Time Rainfall
    • Interactive Map
    • Annual Reports
  • Fiscal Services
  • Resources
    • SSCAFCA Criteria Manuals
    • Policy/Development
    • Watershed Park Management Plans
    • Sediment and Erosion Design Guide
    • Quality of Life
    • Standard Drawings & Specifications
  • Contact Us
  • Social Media Icon
  • Social Media Icon
  • Social Media Icon
August 12, 2022
Projects
Harley’s Pond

Scope:  The purpose of this facility is to attenuate the peak flows from the Tributary A watershed. The pond will discharge to a proposed storm drain in 10th street instead of its historic flow path towards the east. Project Status: Project Complete Project Documents: Plans Meetings: Pre-Bid Meeting (8-31-21), Pre-Con

Read Entire Post
August 11, 2022
Projects
Lower Montoyas Bank Stabilization Project

Scope: To increase flood-carrying capacity and provide erosion protection along the Arroyo de los Montoyas between NM528 and City of Rio Rancho/Village of Corrales municipal boundary. Project Status: Construction Project Documents: Plans Meetings: Pre-Bid Meeting (1/21/2022), Onsite Meetings (varies)     PROJECT INFORMATION Location: City: Rio Rancho Watershed: Montoyas Consultant: Smith Engineering

Read Entire Post
May 3, 2022
News & Announcements Recent News
New journal article highlights the importance of arroyos for groundwater recharge

In a newly published article in the Journal of Hydrology: Regional Studies, we show that arroyos provide important ecosystem services such as groundwater recharge and should be protected to the greatest extent possible. Read more here.

Read Entire Post
February 17, 2022
Board of Directors Environment/Education News & Announcements
Final SSCAFCA Quality of Life Master Plan Update

Final Quality of Life Master Plan Update On February 17, 2022, the SSCAFCA Board of Directors officially accepted and adopted the update to SSCAFCA’s Quality of Life Master Plan.  The original Quality of Life Master Plan was adopted by the Board of Directors in 2006 and laid out a vision for the public

Read Entire Post
  • Page
  • 1
  • 2
  • 3
  • 4
Recent News
  • Zoom Info for the May 15th Regular Board Meeting
  • Invitation for Bids: IFB 2025-02 Upper Venada Off-Channel Facility
  • 2027-2031 Infrastructure Capital Improvement Plan (ICIP) for SSCAFCA – Open for public comment
  • SSCAFCA In The News
  • Request for Proposals RFP 2025-01 – Design & Engineering Services for Honduras Area Flood Reduction Project

Archives

  • 2025
  • 2024
  • 2023
  • 2022
  • 2021
  • 2020
  • 2019
  • 2018
  • 2017
  • 2016
Southern Sandoval County Arroyo
Flood Control Authority
1041 Commercial Drive SE
Rio Rancho New Mexico, 87124
Office Phone:(505) 892-7246
Footer Logo
  • All rights reserved 2025 © Southern Sandoval County Arroyo Flood Control Authority
  • Site Map
  • Privacy Policy