Skip to content
  • Home
  • About Us
    • SSCAFCA Staff
    • Our Building
    • Careers
  • News
    • Board Meetings
    • Board Meeting Agendas Archive
    • Board Meeting Minutes Archive
    • RFP’s/IFB’s
  • Projects
  • Education & Outreach
    • Stormwater Quality Program
    • Know Your Arroyos
    • Outreach Programs
    • Research
    • Real Time Rainfall
    • Interactive Map
    • FAQs
    • Annual Reports
  • Fiscal Services
  • Resources
    • Policy/Development
    • Watershed Park Management Plans
    • Sediment and Erosion Design Guide
    • Quality of Life
    • Standard Drawings & Specifications
  • Contact Us
Announcement: Career Opportunity - Staff Engineer (Operations) Learn More
Mobile Logo
Desktop Logo
  • Home
  • About Us
    • SSCAFCA Staff
    • Our Building
    • Careers
  • News
    • Board Meetings
    • Board Meeting Agendas Archive
    • Board Meeting Minutes Archive
    • RFP’s/IFB’s
  • Projects
  • Education & Outreach
    • Stormwater Quality Program
    • Know Your Arroyos
    • Outreach Programs
    • Research
    • Real Time Rainfall
    • Interactive Map
    • FAQs
    • Annual Reports
  • Fiscal Services
  • Resources
    • Policy/Development
    • Watershed Park Management Plans
    • Sediment and Erosion Design Guide
    • Quality of Life
    • Standard Drawings & Specifications
  • Contact Us
  • Social Media Icon
  • Social Media Icon
  • Social Media Icon
June 6, 2017
Operations and maintenance Projects
Comanche Easement maintenance

Comanche easement maintenance, below are the photos for the before and after maintenance work. This project is downstream off of Comanche Road, north of Hood Road. The total project cost was $6700.00 Concrete debris in easement bottom Looking east from Comanche, cleaned easement             Erosion between block wall and slope paving   Filling in erosion behind the

Read Entire Post
March 1, 2017
Projects
Acapulco Rd. Improvements

Acapulco Rd. Improvements Project Construction was completed on 07/07/2017 The purpose of this project was to provide permanent protection over the top of the recently constructed storm drain (Completed with Alberta Rd. project).  This project provided curb & gutter and asphalt paving along approximately 430-feet of Acapulco Rd., south of Alberta Ave. in Rio

Read Entire Post
January 24, 2017
News & Announcements Operations and maintenance Projects
Enchanted Hills Dam maintenance

This project was complete the beginning of January 2017. Northeast corner looking south at the outlet pre-construction-showing ponding where invasive species took over limiting infiltration Enchanted Hills Dam was constructed in 2002, for the protection of NM528 to reduce the flow of stormwater coming off of the upstream area. The area above

Read Entire Post
January 13, 2017
News & Announcements Projects
Alberta Watershed Improvements, Phase 2

Alberta Watershed Improvements, Phase 2 The Alberta Watershed Improvements, Phase 2 project, consists of the installation of approximately 3,640 linear feet of storm drain with diameters ranging from 24” to 54”, paving of Alberta Dr. from Saratoga to NM528, installation of curb and gutters along Alberta Dr., and associated manholes and curb inlets

Read Entire Post
  • Page
  • 1
  • 2
Recent News
  • Lower Arroyo Venada Bank Stabilization Project
  • Lisbon Pond Project
  • Job Opportunity – Staff Engineer (Operations)
  • Lower Montoyas Bank Stabilization Project ribbon cutting
  • IFB 2022-03 – Lower Arroyo Venada Bank Stabilization Project

Archives

  • 2023
  • 2022
  • 2021
  • 2020
  • 2019
  • 2018
  • 2017
  • 2016
  • 2015
  • 2014
Southern Sandoval County Arroyo
Flood Control Authority
1041 Commercial Drive SE
Rio Rancho New Mexico, 87124
Office Phone:(505) 892-7246
Footer Logo
  • All rights reserved 2022 © Southern Sandoval County Arroyo Flood Control Authority
  • Site Map
  • Privacy Policy