Skip to content
  • Home
  • About Us
    • SSCAFCA Staff
    • Our Building
    • Careers
  • News
    • Arroyo de la Barranca Lateral Erosion Envelope (LEE) Property Acquisition Project
    • AHRA
    • Bond Election
    • Board Meetings
    • Board Meeting Agendas Archive
    • Board Meeting Minutes Archive
    • RFP’s/IFB’s
  • Projects
  • Education & Outreach
    • Stormwater Quality Program
    • Know Your Arroyos
    • Outreach Programs
    • Research
    • Real Time Rainfall
    • Interactive Map
    • Annual Reports
  • Fiscal Services
  • Resources
    • SSCAFCA Criteria Manuals
    • Policy/Development
    • Watershed Park Management Plans
    • Sediment and Erosion Design Guide
    • Quality of Life
    • Standard Drawings & Specifications
  • Contact Us
Mobile Logo
Desktop Logo
  • Home
  • About Us
    • SSCAFCA Staff
    • Our Building
    • Careers
  • News
    • Arroyo de la Barranca Lateral Erosion Envelope (LEE) Property Acquisition Project
    • AHRA
    • Bond Election
    • Board Meetings
    • Board Meeting Agendas Archive
    • Board Meeting Minutes Archive
    • RFP’s/IFB’s
  • Projects
  • Education & Outreach
    • Stormwater Quality Program
    • Know Your Arroyos
    • Outreach Programs
    • Research
    • Real Time Rainfall
    • Interactive Map
    • Annual Reports
  • Fiscal Services
  • Resources
    • SSCAFCA Criteria Manuals
    • Policy/Development
    • Watershed Park Management Plans
    • Sediment and Erosion Design Guide
    • Quality of Life
    • Standard Drawings & Specifications
  • Contact Us
  • Social Media Icon
  • Social Media Icon
  • Social Media Icon
September 20, 2022
Projects
Harvey Jones Outlet

SCOPE:  Install new outfall for treated water effluent line, including concrete placement, rip-rap, bar grate, by-pass pumping, and minor earthwork to connect to existing channel. PROJECT STATUS: Project Complete PROJECT DOCUMENTS: Plans MEETINGS: Pre-Bid (9/13/21), Pre-Con (12/14/21)   PROJECT INFORMATION: CITY: City of Rio Rancho/Village of Corrales WATERSHED: Montoyas CONSULTANT: Huitt-Zollars CONTRACTOR:  CBKN CONSTRUCTION COST: $279,080.00 +NMGRT CONSTUCTION

Read Entire Post
August 12, 2022
Projects
Harley’s Pond

Scope:  The purpose of this facility is to attenuate the peak flows from the Tributary A watershed. The pond will discharge to a proposed storm drain in 10th street instead of its historic flow path towards the east. Project Status: Project Complete Project Documents: Plans Meetings: Pre-Bid Meeting (8-31-21), Pre-Con

Read Entire Post
August 11, 2022
Projects
Lower Montoyas Bank Stabilization Project

Scope: To increase flood-carrying capacity and provide erosion protection along the Arroyo de los Montoyas between NM528 and City of Rio Rancho/Village of Corrales municipal boundary. Project Status: Construction Project Documents: Plans Meetings: Pre-Bid Meeting (1/21/2022), Onsite Meetings (varies)     PROJECT INFORMATION Location: City: Rio Rancho Watershed: Montoyas Consultant: Smith Engineering

Read Entire Post
  • Page
  • 1
  • ...
  • 6
  • 7
  • 8
Recent News
  • Zoom Info for the May 15th Regular Board Meeting
  • Invitation for Bids: IFB 2025-02 Upper Venada Off-Channel Facility
  • 2027-2031 Infrastructure Capital Improvement Plan (ICIP) for SSCAFCA – Open for public comment
  • SSCAFCA In The News
  • Request for Proposals RFP 2025-01 – Design & Engineering Services for Honduras Area Flood Reduction Project

Archives

  • 2025
  • 2024
  • 2023
  • 2022
  • 2021
  • 2020
  • 2019
  • 2018
  • 2017
  • 2016
Southern Sandoval County Arroyo
Flood Control Authority
1041 Commercial Drive SE
Rio Rancho New Mexico, 87124
Office Phone:(505) 892-7246
Footer Logo
  • All rights reserved 2025 © Southern Sandoval County Arroyo Flood Control Authority
  • Site Map
  • Privacy Policy