Skip to content
  • Home
  • About Us
    • SSCAFCA Staff
    • Our Building
    • Careers
  • News
    • Hazard Mitigation Plan
    • Arroyo de la Barranca Lateral Erosion Envelope (LEE) Property Acquisition Project
    • AHRA
    • Board Meetings
    • Board Meeting Agendas Archive
    • Board Meeting Minutes Archive
    • RFP’s/IFB’s
    • SSCAFCA 2025 Election Information
  • Projects
  • Education & Outreach
    • Stormwater Quality Program
    • Know Your Arroyos
    • Outreach Programs
    • Research
    • Real Time Rainfall
    • Interactive Map
    • Annual Reports
  • Fiscal Services
  • Resources
    • SSCAFCA Criteria Manuals
    • Policy/Development
    • Watershed Park Management Plans
    • Sediment and Erosion Design Guide
    • Quality of Life
    • Standard Drawings & Specifications
  • Contact Us
Mobile Logo
Desktop Logo
  • Home
  • About Us
    • SSCAFCA Staff
    • Our Building
    • Careers
  • News
    • Hazard Mitigation Plan
    • Arroyo de la Barranca Lateral Erosion Envelope (LEE) Property Acquisition Project
    • AHRA
    • Board Meetings
    • Board Meeting Agendas Archive
    • Board Meeting Minutes Archive
    • RFP’s/IFB’s
    • SSCAFCA 2025 Election Information
  • Projects
  • Education & Outreach
    • Stormwater Quality Program
    • Know Your Arroyos
    • Outreach Programs
    • Research
    • Real Time Rainfall
    • Interactive Map
    • Annual Reports
  • Fiscal Services
  • Resources
    • SSCAFCA Criteria Manuals
    • Policy/Development
    • Watershed Park Management Plans
    • Sediment and Erosion Design Guide
    • Quality of Life
    • Standard Drawings & Specifications
  • Contact Us
  • Social Media Icon
  • Social Media Icon
  • Social Media Icon
August 15, 2016
Operations and maintenance
Removal of debris in drainage easement

Pre-monsoon clean up: Pecos Loop and Whitney Court and Black Hills and Spring, drainage easement cleared of debris , trash and invasive tree species.   AFTER:

Read Entire Post
August 15, 2016
Operations and maintenance
Monsoon maintenance

In preparation for the monsoon season the Westside Channel was cleared of tumbleweeds and trash. During dry windy times a variety of plants like tumble weeds and trash can accumulate in the arroyos and channels. These items can be pickup by stormwater and carried down to the Rio Grande.         AFTER

Read Entire Post
August 15, 2016
Operations and maintenance
Enchanted Hills Dam 1

Enchanted Hills Dam 1 maintenance updates for September 2016 In Enchanted Hills Dam 1 all of the cattails have been mowed to allow for infiltration and evaporation of run-off. A survey has been conducted to determine “Design” grades for sediment removal.

Read Entire Post
July 8, 2016
Environment/Education News & Announcements Projects Recent News
LEE Brochure

SSCAFCA has Released the Lateral Erosion Envelope (LEE) Brochure! Click here to Download the PDF Version: LEE Brochure “Protect your property and your investment by understanding how arroyos move”. This brochure will be of interest to homeowners, property owners, realtors, developers and others in Rio Rancho, Corrales and Bernalillo.  

Read Entire Post
  • Page
  • 1
  • 2
  • 3
Recent News
  • RFP 2025-02 – Professional Planning Services – SSCAFCA Land Management and Quality of Life Manual
  • Zoom Info for the September Regular Board Meeting – September 18, 2025
  • Rainfall-Runoff Monitoring Project
  • SSCAFCA in the News
  • Invitation for Bids: IFB 2025-03 Lisbon Channel Improvements Southern Blvd to Pedestrian Bridge

Archives

  • 2025
  • 2024
  • 2023
  • 2022
  • 2021
  • 2020
  • 2019
  • 2018
  • 2017
  • 2016
Southern Sandoval County Arroyo
Flood Control Authority
1041 Commercial Drive SE
Rio Rancho New Mexico, 87124
Office Phone:(505) 892-7246
Footer Logo
  • All rights reserved 2025 © Southern Sandoval County Arroyo Flood Control Authority
  • Site Map
  • Privacy Policy