Test Post
Comanche easement maintenance, below are the photos for the before and after maintenance work. This project is downstream off of Comanche Road, north of Hood Road. The total project cost was $6700.00 Concrete debris in easement bottom Looking east from Comanche, cleaned easement Erosion between block wall and slope paving Filling in erosion behind the
This project was complete the beginning of January 2017. Northeast corner looking south at the outlet pre-construction-showing ponding where invasive species took over limiting infiltration Enchanted Hills Dam was constructed in 2002, for the protection of NM528 to reduce the flow of stormwater coming off of the upstream area. The area above
Facilities Maintenance for the Fall of 2016 includes cleaning out vegetation, removing sediment, floatables, trash and protecting citizen from mosquito populations in SSCAFCA ponding areas. In preparation for the monsoon season, SSCAFCA has been completing earth work and vegetation/trash removal at the following sites: Tract H Pond in Tierra de Corrales John Werner bridge Montego