Skip to content
  • Home
  • About Us
    • SSCAFCA Staff
    • Our Building
    • Careers
  • News
    • Board Meetings
    • Board Meeting Agendas Archive
    • Board Meeting Minutes Archive
    • RFP’s/IFB’s
  • Projects
  • Education & Outreach
    • Stormwater Quality Program
    • Know Your Arroyos
    • Outreach Programs
    • Research
    • Real Time Rainfall
    • Interactive Map
    • FAQs
    • Annual Reports
  • Fiscal Services
  • Resources
    • Policy/Development
    • Watershed Park Management Plans
    • Sediment and Erosion Design Guide
    • Quality of Life
    • Standard Drawings & Specifications
  • Contact Us
Announcement: Career Opportunity - Staff Engineer (Operations) Learn More
Mobile Logo
Desktop Logo
  • Home
  • About Us
    • SSCAFCA Staff
    • Our Building
    • Careers
  • News
    • Board Meetings
    • Board Meeting Agendas Archive
    • Board Meeting Minutes Archive
    • RFP’s/IFB’s
  • Projects
  • Education & Outreach
    • Stormwater Quality Program
    • Know Your Arroyos
    • Outreach Programs
    • Research
    • Real Time Rainfall
    • Interactive Map
    • FAQs
    • Annual Reports
  • Fiscal Services
  • Resources
    • Policy/Development
    • Watershed Park Management Plans
    • Sediment and Erosion Design Guide
    • Quality of Life
    • Standard Drawings & Specifications
  • Contact Us
  • Social Media Icon
  • Social Media Icon
  • Social Media Icon
June 6, 2017
Operations and maintenance Projects
Comanche Easement maintenance

Comanche easement maintenance, below are the photos for the before and after maintenance work. This project is downstream off of Comanche Road, north of Hood Road. The total project cost was $6700.00 Concrete debris in easement bottom Looking east from Comanche, cleaned easement             Erosion between block wall and slope paving   Filling in erosion behind the

Read Entire Post
January 24, 2017
News & Announcements Operations and maintenance Projects
Enchanted Hills Dam maintenance

This project was complete the beginning of January 2017. Northeast corner looking south at the outlet pre-construction-showing ponding where invasive species took over limiting infiltration Enchanted Hills Dam was constructed in 2002, for the protection of NM528 to reduce the flow of stormwater coming off of the upstream area. The area above

Read Entire Post
September 16, 2016
Operations and maintenance
Facilities Maintenance Fall 2016

Facilities Maintenance for the Fall of 2016 includes cleaning out vegetation, removing sediment, floatables, trash and protecting citizen from mosquito populations in SSCAFCA ponding areas. In preparation for the monsoon season, SSCAFCA has been completing earth work and vegetation/trash removal at the following sites: Tract H Pond in Tierra de Corrales John Werner bridge Montego

Read Entire Post
August 15, 2016
Operations and maintenance
Gateway Pond

Gateway Pond after the removal of trash and debris

Read Entire Post
  • Page
  • 1
  • 2
  • 3
Recent News
  • Job Opportunity – Staff Engineer (Operations)
  • Lower Montoyas Bank Stabilization Project ribbon cutting
  • IFB 2022-03 – Lower Arroyo Venada Bank Stabilization Project
  • IFB No. 2022-04 General Facility Maintenance Services
  • RFP 2022-04 – Design & Engineering Services for Nightglow Ave Flood Risk Reduction Project

Archives

  • 2023
  • 2022
  • 2021
  • 2020
  • 2019
  • 2018
  • 2017
  • 2016
  • 2015
  • 2014
Southern Sandoval County Arroyo
Flood Control Authority
1041 Commercial Drive SE
Rio Rancho New Mexico, 87124
Office Phone:(505) 892-7246
Footer Logo
  • All rights reserved 2022 © Southern Sandoval County Arroyo Flood Control Authority
  • Site Map
  • Privacy Policy