SCOPE: To eliminate aggrading issues and provide erosion protection along the Lower Arroyo Venada Bank Stabilization Project. PROJECT STATUS: Construction PROJECT DOCUMENTS: Construction Plans, Lower Arroyo Venada Project Presentation MEETINGS: Weekly Meetings will be held onsite on Wednesdays PROJECT INFORMATION: TOWN: Bernalillo WATERSHED: Venada CONSULTANT: SSCAFCA In-House CONTRACTOR: Pate Construction Company CONSTRUCTION COST: 2.8 million dollars ADVERTISE: January 2023 CONSTRUCTION
Scope: Lisbon Pond was built to protect neighborhoods, roads, and two high-pressure gas lines that serve northern New Mexico from flooding due to rain runoff from intense storms. Project Status: Project Complete PROJECT INFORMATION: Project Area: City: Rio Rancho Watershed: Black Consultant: RESPEC Contractor: Salls Brother’s Construction, Inc. Construction Cost: $1.2 million Construction End: 4-1-21 Photos: One Two Three Four Five Drone Footage:
The Lowers Montoyas Bank Stabilization Project ribbon cutting was held on January 12th. This 4.032 million dollar project was funded by a FEMA/DHSEM Pre-disaster Mitigation Grant in the amount of 3.2 million dollars with additional funding from State of New Mexico Capital Outlay Funds, the City of Rio Rancho and SSCAFCA
Southern Sandoval County Arroyo Flood Control Authority (SSCAFCA) requests responses to Invitation For Bids No. 2022-04. The solicitation document is linked to below. SSCAFCA will accept proposals until December 8, 2022 at 3:00 pm local time at its office building located at 1041 Commercial Drive SE, Rio Rancho, NM 87124. Proposals received after