Scope: To increase flood-carrying capacity and provide erosion protection along the Arroyo de los Montoyas between NM528 and City of Rio Rancho/Village of Corrales municipal boundary. Project Status: Construction Project Documents: Plans Meetings: Pre-Bid Meeting (1/21/2022), Onsite Meetings (varies) PROJECT INFORMATION Location: City: Rio Rancho Watershed: Montoyas Consultant: Smith Engineering